+447441913731
    • English
    • Русский
    • 中文 (中国)
    • Bahasa Melayu
    • Tiếng Việt
    • ไทย
    • Português
    • Español
    • ភាសាខ្មែរ
    • 日本語
  • 11.03.2017

    We are opening the seventh more powerful data centre in Estonia. At this moment this centre is able to storage the amount of power volume up to 11900 Mh/s. Due to the opening of data centre we remove all current restrictions on maximum purchase volume.
    Engineering systems ensure uninterrupted operation of the data center 24 hours 7 days a week, 365 days a year. To do this, absolutely all the items are reserved, ie have a double, which will take over the load if the primary fails.

    BITCOIN

    209%

    Daily Profit